行業(yè)動(dòng)態(tài) 當(dāng)前位置:首頁(yè)-新聞資訊-行業(yè)動(dòng)態(tài)工地安全通道搭設(shè)標(biāo)準(zhǔn)及要求,做法值得參考

工地安全通道搭設(shè)標(biāo)準(zhǔn)及要求,做法值得參考

發(fā)布時(shí)間:2024-08-27 來(lái)源:http://shxcolor.com/

  一、準(zhǔn)備工作1、搭設(shè)前施工員應(yīng)按腳手架搭拆方案的要求,對(duì)架子工進(jìn)行安全技術(shù)交底。

  1、 Preparation work 1: Before installation, the construction worker should provide safety technical instructions to the scaffolding workers according to the requirements of the scaffolding installation and dismantling plan.

  2、按照《建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范》(JGJ130-2011)中構(gòu)造要求,決定腳手架步距等等,具體部署搭設(shè)步驟。

  2. According to the construction requirements of the "Technical Code for Safety of Steel Pipe Scaffolding with Fasteners in Construction" (JGJ130-2011), determine the scaffold step spacing and other specific deployment and installation steps.

  3、材料準(zhǔn)備:對(duì)進(jìn)場(chǎng)的鋼管、扣件、腳手架、安全網(wǎng)等進(jìn)行檢查驗(yàn)收。

  3. Material preparation: Inspect and accept the incoming steel pipes, fasteners, scaffolding, safety nets, etc.

  3.1搭設(shè)腳手架全部采用ф48mm,壁厚3.5mm的鋼管,懸挑型鋼采用16#工字鋼,其質(zhì)量符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)規(guī)定。

  3.1 All scaffolding shall be constructed using steel pipes with a diameter of ф 48mm and a wall thickness of 3.5mm. The cantilever steel shall be 16 # I-beam, and its quality shall comply with the current national standards.

  3.2腳手架鋼管的尺寸、橫向水平桿最大長(zhǎng)度2.2m,其它桿最大長(zhǎng)度為6.5 m,每根鋼管的最大質(zhì)量不小于25KG。

  3.2 The size of the scaffold steel pipe, the maximum length of the horizontal bar is 2.2m, the maximum length of other bars is 6.5m, and the maximum mass of each steel pipe is not less than 25KG.

  3.3鋼管表面平直光滑,無(wú)裂縫、結(jié)疤、分層、錯(cuò)位、硬彎、毛剌、壓痕和深的劃痕。

  3.3 The surface of the steel pipe is straight and smooth, without cracks, scars, delamination, misalignment, hard bending, burrs, indentations, and deep scratches.

  3.4鋼管上嚴(yán)禁打孔,鋼管在便用前先涂刷防銹漆。

  3.4 It is strictly prohibited to drill holes on steel pipes. Steel pipes should be coated with anti rust paint before use.

  3.5扣件材質(zhì)必須符合《鋼管腳手架扣件》(GB15831-2006)規(guī)定。

  3.5 The material of the fasteners must comply with the provisions of "Steel Pipe Scaffold Fasteners" (GB15831-2006).

  3.5.1新扣件具有生產(chǎn)許可證,法定檢測(cè)單位的測(cè)試報(bào)告和產(chǎn)品質(zhì)量合格證。對(duì)扣件質(zhì)量有懷疑時(shí),按現(xiàn)行國(guó)家規(guī)定標(biāo)準(zhǔn)《鋼管腳手架扣件》(GB15831-2006)規(guī)定抽樣檢測(cè)。對(duì)不合格品禁止使用。

  3.5.1 The new fasteners have a production license, a test report from a legal testing unit, and a product quality certificate. When there is doubt about the quality of fasteners, sampling and testing shall be carried out in accordance with the current national standard "Steel Pipe Scaffold Fasteners" (GB15831-2006). The use of non-conforming products is prohibited.

  3.5.1舊扣件使用前,先進(jìn)行質(zhì)量檢查,有裂縫、變形的嚴(yán)禁使用,出現(xiàn)滑絲的螺拴進(jìn)行更換處理。

  3.5.1 Before using old fasteners, quality inspection should be carried out first. Those with cracks or deformations are strictly prohibited from use, and bolts with slipping threads should be replaced.

  3.5.1新、舊扣件均進(jìn)行防銹處理。

  3.5.1 Both new and old fasteners shall undergo rust prevention treatment.

  3.6腳手片用毛竹腳手片或木板,無(wú)發(fā)霉、腐蝕。

  3.6 Use bamboo or wooden planks for the scaffolding, without mold or corrosion.

  3.7密目式安全網(wǎng)必須有建設(shè)主管部門認(rèn)證的產(chǎn)品。

  3.7 The dense mesh safety net must have a product certified by the construction supervisory department.

  4、搭設(shè)場(chǎng)地準(zhǔn)備:根據(jù)腳手架搭設(shè)高度、搭設(shè)場(chǎng)地土質(zhì)情況與堅(jiān)實(shí)平整,不積水,砼硬化。經(jīng)驗(yàn)收合格后,按方案的要求放線定位。

  4. Preparation for setting up the site: Based on the height of the scaffold, the soil condition of the site, and its solidity and flatness, without water accumulation, and with hardened concrete. After passing the acceptance inspection, lay out and position according to the requirements of the plan.

  4.1腳手架地基與基礎(chǔ)的施工,根據(jù)腳手架搭設(shè)高度,原土或回填土必須事先進(jìn)行夯實(shí)(地基能承受0.8kg/c㎡的壓力),根據(jù)現(xiàn)行國(guó)家標(biāo)準(zhǔn)<<地基與基礎(chǔ)工程施工及驗(yàn)收規(guī)范>>(JBJ202)做好腳手架地基與基礎(chǔ)的施工要求,后用C20砼澆筑厚度不小于10cm硬化,2m平面沿桿基礎(chǔ)周邊位置,基礎(chǔ)和能承受上澡結(jié)構(gòu)荷載。

  4.1 Construction of Scaffold Foundation and Foundation: According to the height of the scaffold, the original soil or backfill soil must be compacted in advance (the foundation can withstand a pressure of 0.8kg/c ㎡). According to the current national standard<Code for Construction and Acceptance of Foundation and Foundation Engineering>(JBJ202), the construction requirements for scaffold foundation and foundation must be met. Then, C20 concrete with a thickness of not less than 10cm should be poured and hardened. The foundation should be able to withstand the load of the surrounding structure along the 2m plane of the pole foundation.

  4.2腳手架底面標(biāo)高高于自然地坪50mm。

  4.2 The bottom elevation of the scaffold is 50mm higher than the natural floor.

  4.3立桿基礎(chǔ)外側(cè)設(shè)置截面20cm×20cm的排水溝。

  4.3 Install a drainage ditch with a cross-sectional area of 20cm × 20cm on the outer side of the pole foundation.

  5、架子工應(yīng)持有效的特種作業(yè)人員操作證上崗作業(yè)。必須戴好安全帽、佩安全帶、必須穿鞋,嚴(yán)禁穿塑料底鞋,皮鞋等硬底易滑的鞋子登高作業(yè)。操作工具及小零件要放在工具袋內(nèi),扎緊衣袖口,領(lǐng)口以及褲腿口,以防鉤掛發(fā)生危險(xiǎn)。

  5. Scaffolders should hold valid special operation personnel operation certificates to work. It is necessary to wear a safety helmet, seat belt, and shoes. It is strictly prohibited to wear shoes with plastic soles, leather shoes, or other hard soles that are prone to slipping when working at heights. The operating tools and small parts should be placed in the tool bag, and the cuffs, collar, and pant legs should be tightly tied to prevent danger caused by hooking.

微信圖片_20240305114231

  二、腳手架設(shè)計(jì)尺寸

  2、 Scaffold design dimensions

  1、腳手架底步距為2m,其余每步為1.8m.

  1. The bottom step distance of the scaffold is 2m, and each other step is 1.8m

  2、立桿縱距為1.5m,橫距為1.2m.

  2. The vertical distance of the pole is 1.5m, and the horizontal distance is 1.2m

  3、踢腳桿、防護(hù)桿從第二步起設(shè)置分別為0.3m和平共處2m,頂排防護(hù)欄不少于二道,高度分別為0.9m、1.3m.

  3. Starting from the second step, the kickboard and protective pole should be set at 0.3m and 2m respectively, and the top row of protective barriers should not be less than two, with heights of 0.9m and 1.3m respectively

  4、剪刀撐設(shè)置為間距為9m(6跨)一排剪刀撐。

  4. The scissor braces are arranged in a row with a spacing of 9m (6 spans).

  5、連墻桿件設(shè)置為豎向每層、水平向?yàn)樗目纭?/p>

  5. The connecting wall members are set vertically for each floor and horizontally for four spans.

微信圖片_202403051142557ee004593d3b17f9d83135591ee26c0關(guān)于1

  三、斜道搭設(shè)標(biāo)準(zhǔn)

  3、 Standards for the construction of ramps

  上下人行通道可附著在建筑物設(shè)置,也可附著在腳手架外側(cè)設(shè)置,但搭設(shè)通道的桿件必須獨(dú)立設(shè)置。架高6m以下宜采用一字型斜道,架高6m以上宜采用之字型斜道。

  The pedestrian walkway can be attached to the building or the outside of the scaffold, but the members of the walkway must be independently installed. A straight shaped ramp should be used for frames below 6 meters in height, and a zigzag ramp should be used for frames above 6 meters in height.

  斜道構(gòu)造應(yīng)符合下列要求:

  The ramp structure should meet the following requirements:

  1、人行斜道寬度不應(yīng)小于1m,坡度宜采用1:3(高:長(zhǎng))。

  1. The width of pedestrian ramps should not be less than 1m, and the slope should be 1:3 (height: length).

  2、拐彎處應(yīng)設(shè)置平臺(tái),寬度不小于斜道寬度。

  2. A platform should be set up at the corner, with a width not less than the width of the ramp.

  3、斜道兩側(cè)及平臺(tái)外圍均必須設(shè)置欄桿及擋腳板。欄桿高度為1.2m,擋腳板高度不應(yīng)小于150mm。

  3. Both sides of the ramp and the periphery of the platform must be equipped with railings and toe boards. The height of the railing should be 1.2m, and the height of the toe board should not be less than 150mm.

  4、腳手板必須按腳手架的寬度滿鋪,板與板之間靠緊,腳手板橫鋪時(shí),應(yīng)在橫向水平桿下增設(shè)縱向支托桿,縱向支托桿間距不應(yīng)大于500mm。

  4. The scaffold board must be fully laid according to the width of the scaffold, and the boards should be close to each other. When laying the scaffold board horizontally, longitudinal support rods should be added under the horizontal bars, and the spacing between the longitudinal support rods should not exceed 500mm.

  5、人行斜道的腳手板上每隔250~300mm設(shè)置一根防滑木條,木條厚度宜采用20~30mm。

  5. A non slip wooden strip should be installed every 250-300mm on the scaffold board of the pedestrian ramp, with a thickness of 20-30mm.

  6、入口處門洞高不小于1.8米,門洞兩側(cè)須掛設(shè)安全警示標(biāo)志牌,斜道必須設(shè)置密目網(wǎng)。

  6. The entrance door opening must be no less than 1.8 meters high, and safety warning signs must be hung on both sides of the door opening. The ramp must be equipped with a dense mesh.

  四、縱向、橫向水平桿、腳手板、防護(hù)欄桿、踢腳桿

  4、 Vertical and horizontal horizontal bars, scaffold boards, protective railings, kick bars

  1、縱向水平桿設(shè)置在立桿內(nèi)側(cè),其長(zhǎng)度不小于3跨??v向水平桿接長(zhǎng)采用對(duì)接扣件連接,交錯(cuò)布置,兩根相鄰縱向水平接頭設(shè)置相互錯(cuò)開不小于500mm,各接頭中心至最近主節(jié)點(diǎn)的距離不大于縱距的1/3。

  1. The longitudinal horizontal pole is set on the inner side of the upright pole, with a length of not less than 3 spans. The longitudinal horizontal bars are connected by butt fasteners and arranged in a staggered manner. Two adjacent longitudinal horizontal joints are staggered by no less than 500mm, and the distance from the center of each joint to the nearest main node is no more than one-third of the longitudinal distance.

  2、縱向搭接長(zhǎng)度不小于1米,并等間距設(shè)置3個(gè)旋轉(zhuǎn)扣件固定,端部扣件蓋板邊緣至搭接縱向水平桿桿端的距離不小于100mm。

  2. The longitudinal overlap length shall not be less than 1 meter, and 3 rotating fasteners shall be fixed at equal intervals. The distance from the edge of the end fastener cover plate to the end of the overlapping longitudinal horizontal rod shall not be less than 100mm.

  3、縱向水平桿的各節(jié)點(diǎn)處采用直角扣件固定在橫向水平桿上。

  3. The nodes of the longitudinal horizontal bar are fixed to the transverse horizontal bar with right angle fasteners.

  4、橫向水平桿的各個(gè)節(jié)點(diǎn)處必須設(shè)置并采用直角扣件扣接且嚴(yán)禁拆除。

  4. At each node of the horizontal bar, it is necessary to install and use right angle fasteners for fastening, and it is strictly prohibited to remove them.

  5、腳手片必須垂直于墻面橫向鋪設(shè),滿鋪到位,不留空位。四角用18鐵絲雙股并聯(lián)綁扎,固定在縱向水平桿上,要求綁扎牢固,交接處平整,無(wú)空頭板。

  5. The scaffolding must be laid vertically and horizontally to the wall, fully in place without leaving any gaps. The four corners are tied in parallel with double strands of 18 iron wire and fixed on a longitudinal horizontal rod. The binding should be firm, the junction should be flat, and there should be no empty boards.

  6、腳手片底層滿鋪,中間每隔三層,操作層的上下層頂層都必須滿鋪。

  6. The bottom layer of the footrest must be fully covered, with every three layers in between. The top layer of the upper and lower layers of the operating layer must also be fully covered.

  7、腳手片外側(cè)自第二步起必須設(shè)1.2m高同材質(zhì)的防護(hù)欄和30cm高處的踢腳桿。

  7. From the second step onwards, a 1.2m high protective fence made of the same material and a 30cm high kickboard must be installed on the outer side of the footrest.

  五、立桿

  5、 Vertical pole

  1、每根立桿垂直穩(wěn)放在墊板上。

  1. Each upright pole is vertically and stably placed on the cushion plate.

  2、腳手架里立桿距離墻體凈距為20cm,大于20cm處的須鋪設(shè)站人腳手片,并設(shè)置平穩(wěn)牢固。

  2. The clear distance between the upright pole in the scaffold and the wall is 20cm. If it is greater than 20cm, scaffolding should be installed and set steadily and firmly.

  3、腳手架必須設(shè)置縱、橫向掃地桿??v向掃地桿采用直角扣件固定在距離底座上不大于200處的立桿上。橫向掃地桿亦采用直角扣件固定在緊靠縱向掃地桿下方的立桿上。當(dāng)立桿基礎(chǔ)不在同一高度上時(shí),必須將高處的縱向掃地桿向低處延伸長(zhǎng)兩跨與立桿固定,高低差不小于1m,靠邊坡上方的立桿軸線到邊坡的距離不小于500mm。

  3. Scaffolding must be equipped with vertical and horizontal sweeping rods. The vertical sweeping pole is fixed to the upright pole at a distance of no more than 200 from the base using right angle fasteners. The horizontal sweeping rod is also fixed to the upright rod immediately below the vertical sweeping rod with right angle fasteners. When the foundation of the upright pole is not at the same height, the longitudinal sweeping pole at a high place must be extended two spans to a lower place and fixed to the upright pole, with a height difference of not less than 1m. The distance from the axis of the upright pole above the slope to the slope should not be less than 500mm.

  4、立桿必須用連墻件與建筑物可靠連接。

  4. The upright pole must be reliably connected to the building with wall connectors.

  5、立桿接長(zhǎng)除頂層步可采用搭接外,其余各層各步接頭必須用

  5. Except for the top layer step, which can be overlapped, the joints of all other layers and steps must be connected

 ?、佟?duì)接扣件連接。對(duì)接、搭接均須符合下列規(guī)定:立桿上的對(duì)接扣件交錯(cuò)布置,兩根相鄰立桿的接頭相互錯(cuò)開,不設(shè)置在同步內(nèi),同步內(nèi)隔一根立桿的兩個(gè)相隔接頭在高度方向錯(cuò)開的距離不小于500,各接頭中心至主節(jié)點(diǎn)的距離不大于步距的1/3。

  ① Connect the docking fasteners. Docking and overlapping must comply with the following regulations: the docking fasteners on the upright pole are arranged in a staggered manner, the joints of two adjacent upright poles are staggered and not set in synchronization, and the distance between the two spaced joints of one upright pole within synchronization in the height direction is not less than 500, and the distance from the center of each joint to the main node is not more than 1/3 of the step distance.

 ?、凇⒋罱娱L(zhǎng)度不應(yīng)小于1m,應(yīng)采用不小于2個(gè)旋轉(zhuǎn)扣件固定,端部扣件蓋板的邊緣至桿端距離不應(yīng)小于100mm。

 ?、?The overlap length should not be less than 1m, and should be fixed with no less than 2 rotating fasteners. The distance from the edge of the end fastener cover plate to the end of the rod should not be less than 100mm.

  六、連墻件

  6、 Wall connecting components

  1、連墻件數(shù)量的設(shè)置,堅(jiān)向間距為每層,橫向間距為4跨。

  1. The number of wall connecting components is set with a vertical spacing of each layer and a horizontal spacing of 4 spans.

  2、連墻件的布置。

  2. Arrangement of wall connecting components.

 ?、僖丝拷鞴?jié)點(diǎn)設(shè)置,偏離主節(jié)點(diǎn)的距離不應(yīng)大于300mm。

 ?、?It is advisable to set it close to the main node, and the distance from the main node should not exceed 300mm.

 ?、趹?yīng)從底層第一步縱向水平桿處開始設(shè)置。

  ② The setting should start from the first vertical horizontal bar at the bottom level.

 ?、垡藘?yōu)先采用菱形布置,也可采用方形,矩形布置。

 ?、?It is advisable to use diamond shaped layout, but square or rectangular layout can also be used.

  ④一字型、開口型腳手架的兩端必須設(shè)連墻桿,連墻件的垂直距不應(yīng)大于建筑物的層高,并不應(yīng)大于4m(2步)。

  ④ The two ends of the straight and open scaffolding must be equipped with wall connecting rods, and the vertical distance between the wall connecting members should not exceed the height of the building and should not exceed 4m (2 steps).

 ?、莶捎脛傂赃B墻件與建筑物可靠連接,可采用Φ12鋼筋預(yù)埋或砼中,鋼筋與鋼管焊接配合使用的附墻連接方式。

  ⑤ Rigid wall connecting components can be used to reliably connect with buildings, and the wall attachment connection method can be achieved by embedding Φ 12 steel bars or welding steel bars and steel pipes in concrete.

  七、門洞

  7、 Door opening

  腳手架門洞宜采用上升斜桿,平行弦桿桁結(jié)構(gòu)形式,鈄桿與地面的傾角a應(yīng)在45°~60°之間。門洞桁架的形式宜按下列要求確定:

  The scaffold door opening should adopt a rising diagonal rod, parallel chord truss structure, and the inclination angle a between the diagonal rod and the ground should be between 45 ° and 60 °. The form of the door opening truss should be determined according to the following requirements:

  1、當(dāng)步距(h)小于縱距(La)時(shí),應(yīng)采用A型。

  1. When the step distance (h) is less than the longitudinal distance (La), type A should be used.

  2、當(dāng)步距(h)大于縱距(La)時(shí),應(yīng)采用B型,并應(yīng)符合下列規(guī)定。

  2. When the step distance (h) is greater than the longitudinal distance (La), type B should be used and the following regulations should be followed.

  2.1 h=1.8m時(shí),縱距不應(yīng)大于1.5m;

  When h=1.8m, the longitudinal distance should not exceed 1.5m;

  2.2 h=2m時(shí),縱距不應(yīng)大于1.2m。

  When 2.2 h=2m, the longitudinal distance should not exceed 1.2m.

  八、剪刀撐、安全網(wǎng)

  8、 Scissor braces, safety nets

  1、每道剪刀撐跨越立桿的根數(shù)6根(小于9m)。

  1. Each diagonal brace spans 6 poles (less than 9m).

  2、與地面的傾角宜在45°~60°之間。

  2. The inclination angle with the ground should be between 45 ° and 60 °.

  3、應(yīng)在外側(cè)立面整個(gè)長(zhǎng)度和高差上連接設(shè)置剪刀撐。

  3. Scissor braces should be connected and installed along the entire length and height difference of the outer facade.

  4、剪刀撐斜桿的接長(zhǎng)宜采用搭接,搭接長(zhǎng)度不應(yīng)小于1m,兩根撐桿須交錯(cuò)布置,同立桿的交錯(cuò)相同。

  4. The extension of diagonal braces should be done by overlapping, and the overlapping length should not be less than 1m. The two braces should be arranged in a staggered manner, with the same staggered arrangement as the upright.

  5、剪刀斜桿應(yīng)用旋轉(zhuǎn)扣件固定在與相交的橫向水平桿的伸出端或立桿上,旋轉(zhuǎn)扣件中心線至主節(jié)點(diǎn)的距離不宜大于150mm。

  5. The scissor diagonal rod should be fixed on the extended end or upright pole of the intersecting horizontal rod with a rotating fastener, and the distance from the centerline of the rotating fastener to the main node should not exceed 150mm.

  6、一字型、開口型雙排腳手架的兩端均必須設(shè)置橫向斜撐,中間宜每隔6跨設(shè)置一道。

  6. Horizontal slant support must be set at both ends of straight and open type double row scaffolds, and should be set every 6 spans in the middle.

  7、腳手架外側(cè)必須用建設(shè)主管部門認(rèn)證的合格的密目式安全網(wǎng)封閉,且應(yīng)將安全網(wǎng)固定在腳手架外立桿里側(cè),應(yīng)用18#鉛絲張持嚴(yán)密。

  7. The outer side of the scaffold must be enclosed with a qualified dense mesh safety net certified by the construction authority, and the safety net should be fixed on the inner side of the scaffold's outer pole, tightly tensioned with 18 # lead wire.

  九、避雷裝置

  9、 Lightning protection device

  1、腳手架頂部高于2m,四角設(shè)置(長(zhǎng)度大于35m,應(yīng)中間設(shè)幾根)避雷針。

  1. The top of the scaffold should be higher than 2 meters, and lightning rods should be installed at the four corners (with a length greater than 35 meters, several should be installed in the middle).

  2、用16mm2黃綠雙色銅芯線作引下線,途中用磁瓶,導(dǎo)線綁扎。

  2. Use 16mm2 yellow green dual color copper core wire as the down conductor, and tie it with magnetic bottles and wires along the way.

  3、接地裝置的接地線應(yīng)采用三根導(dǎo)體,在不同點(diǎn)與接地體作電氣連接,垂直接地體應(yīng)采用5×50角鋼、Φ48鋼管或Φ22圓鋼,長(zhǎng)度2.2m,不得采用螺紋鋼,接地電阻不大于4Ω。

  3. The grounding wire of the grounding device should use three conductors and be electrically connected to the grounding body at different points. The vertical grounding body should use 5 × 50 angle steel, Φ 48 steel pipe or Φ 22 round steel, with a length of 2.2m, and threaded steel should not be used. The grounding resistance should not exceed 4 Ω.

  十、拆除方案及要求

  10、 Demolition plan and requirements

  1、外架拆除前應(yīng)由單位工程負(fù)責(zé)人召集有關(guān)人員對(duì)架子工程進(jìn)行全面檢查與簽證確認(rèn),建筑物施工完畢,且不需要使用時(shí),腳手架方可拆除。

  1. Before dismantling the external scaffolding, the person in charge of the unit project should convene relevant personnel to conduct a comprehensive inspection and visa confirmation of the scaffolding project. The scaffolding can only be dismantled after the construction of the building is completed and no longer in use.

  2、拆除腳手架應(yīng)設(shè)置警戒,張掛醒目的警戒標(biāo)志,禁止非操作人員通行和地面施工人員能行,并有專人負(fù)責(zé)警戒。

  2. When dismantling scaffolding, warning signs should be set up and prominently displayed to prohibit non operators from passing and ground construction personnel from doing so. A dedicated person should be responsible for guarding.

  3、長(zhǎng)立桿、斜桿的拆除應(yīng)由二人配合進(jìn)行,不宜單獨(dú)作業(yè),下班時(shí)應(yīng)檢查是否牢固,必要時(shí)應(yīng)加設(shè)臨時(shí)固定支撐,防止意外。

  3. The dismantling of long vertical poles and diagonal poles should be carried out by two people in coordination, and should not be done alone. When leaving work, it should be checked for firmness, and temporary fixed supports should be added if necessary to prevent accidents.

  4、拆除外架前應(yīng)將通道口上的存留材料雜物清除,按自上而下先裝后拆,后裝先拆的順序。

  4. Before dismantling the outer frame, the remaining materials and debris on the channel opening should be removed in the order of top-down installation followed by dismantling, and later installation followed by dismantling.

  5、拆除順序?yàn)椋喊踩W(wǎng)→踢腳桿→防護(hù)欄桿→剪刀撐→腳手片→擱柵桿→連墻桿→大橫桿→小橫桿→立桿,自上而下拆除,一步一清,不得采用踏步式拆除,不準(zhǔn)上、下同時(shí)作業(yè)。

  5. The dismantling sequence is: safety net → skirting pole → protective railing → scissor brace → footrest piece → joist pole → wall connecting pole → large horizontal bar → small horizontal bar → upright pole. The dismantling should be carried out from top to bottom, step by step, and step by step dismantling is not allowed. It is not allowed to work up and down at the same time.

  6、如遇強(qiáng)風(fēng)、雨、雪等氣候,不能進(jìn)行外架拆除。

  6. In case of strong winds, rain, snow and other weather conditions, the external frame cannot be dismantled.

  7、拆卸的鋼管與扣件應(yīng)分類堆放,嚴(yán)禁高空拋擲。

  7. The dismantled steel pipes and fasteners should be classified and stacked, and throwing them from high altitude is strictly prohibited.

  8、吊下的鋼管與扣件運(yùn)到地面時(shí)應(yīng)及時(shí)按品種規(guī)格堆放整齊。

  8. When the suspended steel pipes and fasteners are transported to the ground, they should be neatly stacked according to the variety and specifications in a timely manner.

  十一、安全質(zhì)量要求

  11、 Safety and quality requirements

  1、扣件式雙排鋼管腳手架搭設(shè)一般順序是:里立桿→外立桿→小橫桿→大橫桿→掃地桿→腳手片→防護(hù)欄桿和踢腳桿→連墻桿→安全網(wǎng)。

  1. The general sequence for setting up a double row steel pipe scaffold with fasteners is: inner upright pole → outer upright pole → small horizontal pole → large horizontal pole → sweeping pole → footrest piece → protective railing and kickboard pole → wall connecting pole → safety net.

  2、腳手架必須配合施工進(jìn)度搭設(shè),一次搭設(shè)高度不應(yīng)超過(guò)相鄰連墻件以上二步,保證搭設(shè)過(guò)程中和穩(wěn)定性。

  2. Scaffolding must be erected in accordance with the construction schedule, and the height of one erection should not exceed two steps above the adjacent connecting wall components to ensure stability during the erection process.

  3、腳手架搭設(shè)中累計(jì)誤差超過(guò)允許偏差,難經(jīng)糾正,每搭完一步腳手架后,按規(guī)定校步距、縱距、橫距、立桿的垂直度。

  3. The cumulative error in scaffolding construction exceeds the allowable deviation and is difficult to correct. After each step of scaffolding construction, the step distance, longitudinal distance, transverse distance, and verticality of the uprights should be calibrated according to regulations.

  4、豎立桿時(shí)應(yīng)由兩人配合操作。大、小橫桿與立桿連接時(shí),也必須兩人配合。

  4. When erecting the pole, two people should cooperate to operate it. When connecting the large and small horizontal bars to the upright, two people must also cooperate.

  5、當(dāng)有六級(jí)及六級(jí)以上大風(fēng)和霧、雨或雪雨、雪天氣時(shí),應(yīng)停止腳手搭設(shè)作業(yè)。雨、雪后上架作業(yè)應(yīng)注意防滑,并采取防滑措施。

  5. When there are winds of level six or above, fog, rain, or snow, scaffolding operations should be stopped. Attention should be paid to anti slip and anti slip measures should be taken when working on shelves after rain and snow.

  6、非操作層腳手架上嚴(yán)禁堆放材料,且必須保持清潔,操作層腳手架上材料堆放不能集中,不能超高,堆放要穩(wěn)固,每平方米的堆放不得超過(guò)300kg,工作完成后及時(shí)清除干凈。

  6. It is strictly prohibited to stack materials on non operational scaffolding, and they must be kept clean. The stacking of materials on operational scaffolding cannot be concentrated, cannot exceed the height limit, and must be stable. The stacking weight per square meter should not exceed 300kg, and should be cleaned up promptly after the work is completed.

  7、腳手架搭設(shè)后由施工企業(yè)組織分段驗(yàn)收(一般不超過(guò)3步架),辦理驗(yàn)收手續(xù)。驗(yàn)收表中應(yīng)寫明驗(yàn)收的部位,內(nèi)容量化,驗(yàn)收人員履行驗(yàn)收簽字手續(xù)。驗(yàn)收不合格和,應(yīng)在整改完畢后重新填寫驗(yàn)收表。腳手架驗(yàn)收合格并掛合格牌后方可使用。

  7. After the scaffolding is erected, the construction enterprise shall organize segmented acceptance (generally not exceeding 3 steps) and handle the acceptance procedures. The acceptance form should specify the parts to be accepted, quantify the content, and require the acceptance personnel to complete the acceptance signature procedures. If the acceptance is not qualified, the acceptance form should be filled out again after the rectification is completed. The scaffold can only be used after passing the acceptance inspection and hanging a qualified sign.

本文由共贏瑞建設(shè)友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊:http://shxcolor.com/真誠(chéng)的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

This article is dedicated by Win Win Rui to building friendship. For more related knowledge, please click: http://shxcolor.com/ Sincere attitude. We provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Please stay tuned

免费a在线播放v| 嫖老熟女A片一二三区| 综合久久中文字幕综合日韩精品| 日本不卡高清视频| 精品少妇人妻av久久免费| A片 AV一级在线播放观看免费| 激情视屏国产乱伦强奸| 久久久久国产精品喷潮免费观看臀| 亚洲国产精品9999在线观看| 高清国产性猛交xxxx乱大交| 中国少妇XXXX做受| 亚洲av噜噜噜噜噜噜| 久久午夜鲁丝片| 天天色天天干天天爱| 亚洲操逼网| 八戒无码国产午夜福利| av日韩国产一区二区| 日韩AV熟女乱伦| 日韩性爱视频在线免费观看 | 无套内射人妻在线播放| 狠狠操使劲操| 美女视频尤物网在线看| 五月婷丁香| 高潮毛片无遮挡高清免费| 99视频内射三四| 日婷婷| 亚洲第一黄色av网站| 日本精品不卡一二三区| 最新国内自拍av免费| 人妻 丝袜美腿 中文字幕| 中文字幕国产在线天堂| 激情综合婷婷| 色色色色网站| 免费黄色片。| 欧美五十路熟| 亚洲 欧美 制服 另类 自拍| 黄色AV免费| 被体育老师抱着c到高潮| 18禁网站在线播放| 欧美黑人精品在线播放| 午夜激情成人在线观看| 久久性爱精品一区| 伊人一区二区在线播放| 九九aV| 亚洲综合一区二区| 全球成人中文在线| 国产超碰人人爽人人做| 日韩性爱再线视频| 717影院理论午夜伦八戒| 人人妻人人爽 97人人看碰人免费公开视频| 亚洲无线观看久久| 911粉嫩人妻| 亚洲各类熟们中文字幕| 99视频自拍| jizz啪啪| 国产欧美精选激情视频| 国产精品美女视频诱惑| 日本精品一级二级三级| 免费A V在线| 大香蕉黄色一区| 亚洲成a人v欧美综合天堂下载| 色噜噜狠狠色综合日日| 欧美成人一级麻豆| 日本成人A片免费看| 殴美在线AⅤ| 免费精品无码一级毛片牛牛影视| 无码精品久久| 日韩,欧美,中文在线| 丁香色色网| 国产亚洲精品精AV.| 艹比视频国产精品| 久久久新亚洲AV| 亚洲一区二区久久久久| 欧美一区二区亚洲天堂| 在线观看一级α片刺激高潮视频| 精品久久久久av影院| 婷婷久久综合| 综合久久久久久久综合网| 人人操人人狠狠操| 亚川综合视频| 狠狠干婷婷| 手机在线中文字幕国产 | 中字幕人妻一区二区三区| 欧美亚洲色图另类国产| 久热9| 久久综合九九| 久久久久久电影| 337p大胆噜噜噜噜噜91Av| 超碰国产精品无码| 久9热| 国产久久av| 中英熟女操女| 中文字幕精品资源在线| 午夜精品久久久久久久久久蜜桃| 97碰在线视频| 色呦呦呦在线观看视频| 国产免费一区在线观看| 日韩性爱1级片视频| 五月天激情综合网| 8x福利精品第一福利视频导航| www.色综合| 日本人人操人人操| 久久黄色性爱视频| 天天干天天舔| 国产 日韩 另类 视频一区爱| 日韩 国产 欧美自拍| 超碰av在线| 国产又色又爽又舒服的三级视频| av网页一区二区三区| 久久成人国产精品| AAAA欧美日韩| 久久狠狠色噜噜狠狠狠狠97| 五月丁香六月婷| 国产大学生高潮在线播放| 黄色AAAAAAAAAAA大片| 少妇无码av专区线| 日日日日做夜夜夜夜无码| 精品久久久久久AV无码| 乱伦日本中文自拍| 亚洲另类欧美精品| 人人玩人人添人人澡免费| 无码一区免费在线不卡| 久久这里只精品免费福利| 呦呦影院| 日韩高清黄片| 日本狂喷奶水在线播放212| 天天爽夜夜爽夜夜爽精| 1769国内精品视频| 大香蕉视频一二三区| 中国一级操逼视频| 无码天天操| 日韩无码黄色片| 强奸乱伦Av网| 26uuu国产免费观看| 精品人妻美妇91job| 国产欧美日韩在线不卡第一页| 精品伊人久久久大香线蕉小说| 乱伦系列一区二区| 五月天婷婷基地| 以及麻豆国产入口在线观看免费| 日逼逼免费看| 欧亚性爱视频免费看| 色五月大香蕉| 色在线综合| 操我无码| 激情久久久| 久操91视频| www.伪伪| 亚洲偷拍自拍在线视频| 久久婷婷五月天| 国产精品久久久久无码Av网曝门| 中国熟女老妇仑乱一区二区三区| 人人做,人人操,人人摸| 3d成人精品一区二区| av资源在线播放天堂| 国内亚洲高清无码| 精品亚洲国产成人av网站| www欧美性爱| 天天干人人看综合| 国内毛片婷婷六月色| 日韩免费性爱视频在线观看| 日韩成人高清一区二区| 精品人妻一区二区视频| 狠狠爱综合网| 色色色色日本| 免费成人自拍视频在线| 日本女优在线视频福利| 亚州熟女乱伦| 91日本在线观看| 欧美国产精品| 福利视频香蕉免费一区二区在线| 狠狠操夜夜| 日韩性爱小视频| 囯产乱伦一区二区三女 | 粉嫩粉嫩一区性色AV片| 日韩肏逼视频| 日本一级性爱| 中文字幕久热视频在线| 人人操欧美风骚| 久操不卡视频| 日韩精品黄片免费观看| 国产家庭乱伦表演| 欧美国产日韩高清在线| 最新中文字幕精品在线| 中文字幕精品一区二| 亚洲婷婷丁香在线| **一级毛片国产| 国产92麻豆天美精品色欲5| 亚洲欧洲中文日韩女优乱码| 四虎精品永久在线播放| 色999;丁香五月| 国产黄色av大片网站 | 国产三级中文有码在线视频| heyZO天然素人无码AⅤ专区| 日本成人在线不卡一区二区三区| 日韩中文字幕视频在线观看| 成年女人黄网站| 国产精品亚洲天堂网址| 熟女这里只有精品6| 亚洲无码 国产无码| 思思热在线观看| 91精品综合久久久久久五月丁香| JULIA一区二区三区在线播放| 淫荡少妇免费| 亚洲系列第一页| www.大香| 99久久精品无码一区二区| 丰满岳乱妇一区二区三区| 国产又黄又粗的视频| 日韩中文字幕国产| 少妇人妻好深太紧了vr91| 久久这里是精品| 国产精品婬乱一级毛片彝族| 国语精品内射在线观看| 女人午夜视频777| 无码国产精品午夜不卡(| 超碰免费人人| 色色亚洲| 欧美人人曰人人操人人射射 | 波多野42部无码喷潮在线观看| 日韩高清黄片| 欧美一区二区三区另类精品| 亚洲国产成人精品无码专区| 国产精品视频白浆免费| 色五月综合网| 26UUU欧美日本| 黄色人人| wwwcaobibi| 久久久久9999| 日本黄色精品专区网站| 亚洲成人日韩小说| 午夜精品久久久久久久99蜜桃一| 色综合色欲色综合色综合色综合| 国产性爱强奸乱伦大全| 99久久精品无码一区二区毛片免费| 久久综合国产精品国产| 亚欧高清在线| 中日韩免费看男女操逼大全| 日韩激情毛片一级久久久| 久久国内| 国产又粗又大硬免费色网视频| 国产探花日韩援交| 国产女生在线| 粉嫩av平台| 婷婷五月天激情网| a男人的天堂久久一级A毛片| 人干人人人操人人摸| 另类天堂| 上海一级黄片| 亚洲欧美综合| 亚洲暴力强奸AV| 老司机午夜精品视频| 欧洲一级性爱视频在线观看| 亚洲欧美高清无码| 国产精品岛国片在线观看| 搡老熟女免费视频 | 十八禁啪啪视频| 色综合久久88色综合久久天天| 欧美91精品国产自产| 日韩成人精品视频自拍| 在线中文字幕| 亚洲无码99| 在线观看日韩av不卡| 大香蕉www.超碰| 激情五月天中文字幕色| 免费看欧美美女黄色大片| 亚洲图片激情综合另类| 亚洲成a人v欧美综合天堂下载| 精品一区二区人妖| 欧美aa一级片| 国产亚洲日韩欧| 美国日韩黄片| 五月丁香啪啪| 影音先锋国产精品| 国产精品无码在线| 欧美大香蕉同搞| 午夜超爽| 久久久久久久九九九九九九| 狠狠操狠狠插| 婷婷色播婷婷| 国模精品一区二区三区苹果色戒 | 国产精品麻豆免费视频| 五月天开心网| 六月丁香啪啪| 五月天婷婷色色| 影音先锋国产精品| 亚洲天堂 视频你懂的| 一级啊性爱在线视频| 香蕉人人操tv| 精品一区二区人妖| 很很热性爱视频| 欧美亚洲中文字幕| 国产成人精品日本亚洲语言| aⅴ日韩成人电影av在线免费看av大全| 双插性欧美一二三区| 欧美天天干| 探花在线免费观看视频国产一区| 2018天天干在线视频| 超碰在线观看av不卡| 93人人操人人| 91操人| 久精品无码av一区二免费国产在线观看 | 日韩综合无码色欲vv| 午夜人人操| 欧美日韩日产免费网站看| 日本日逼高清| 99久久精品无码一区二区| 国产97视频免费观看| 九九黄色视频在线观看| 久久99视频| 国产操逼网站亚洲一级黄色| 男女啪啪啪18禁网站| 韩国手机不卡无码三级视频| 操逼免费视频无码国产| www.91理论| av资源在线播放天堂| 99热综合| 亚洲欧美在线观看无码| 午夜一区二区三区国产| 丁香六月东京热| 五月丁香成人网| 久久中文字幕一区不卡| 26uuu国产成人综合| 综合色色网| 欧美性爱无码一区二区三区| 懂色AV蜜臀无码精品APP| 99久久久无码国产精品性啊聊| 亚洲图片婷婷五月天|